time:2024-02-20 browse:1
The system supports limited or unlimited capacity planning approach. The planning period can be days, weeks, months, or the free combination of these three kinds of planning periods.
• Planning to ensure line balance and inventory control
• Advanced scheduling down to area/line level schedule and material control
• Highly configurable solution to meet flexible planning and scheduling requirement.
• Integrated with ERP, testing information management system, laboratory data acquisition system.
• Allow user to add key factor for scheduling.